Johor, Malaysia
From process development to commercial production
PROJECT EXPERIENCE

Commercial plants. Measurable outcomes.

Selected projects delivered by KRISHISM leadership across Malaysia, Singapore and Indonesia.

100–600 MT/dayplant scale
USD 22Mmajor EPC upgrade
99.7%USP-grade glycerine purity
100 m³/dayindustrial wastewater treatment
SELECTED PORTFOLIO

From brownfield upgrades to new processes.

Each assignment connects process knowledge with practical execution, commissioning and commercial performance.

01
Renewable Energy & Biodiesel

300 MT/day Integrated High-FFA Biodiesel EPC Upgrade

Platinum Green Chemical · Malaysia

Technical leadership for the refurbishment and retrofit of an existing facility into an integrated high-FFA biodiesel production plant.

Project markerUSD 22 million
  • Pretreatment and deodorisation refurbishment
  • New glycerolysis and pre-stripper systems
  • Esterification, transesterification and methanol purification
  • Biodiesel distillation
  • Palm methyl ester production to EN 14214 requirements
  • Processing strategy for palm-based feedstock containing up to approximately 50% FFA
02
Biodiesel Recommissioning

600 MT/day Biodiesel Plant Commercial Restart

U & P Pte Ltd · Singapore

Complete recommissioning programme after an extended shutdown, delivered to the planned schedule and approved budget.

Project markerSGD 723,320
  • Mechanical integrity and process-readiness assessment
  • Instrumentation calibration and utility verification
  • Yokogawa Centum DCS commissioning
  • Reaction, separation, washing, centrifuge and drying systems
  • Methanol distillation and glycerine evaporation
  • Procedures, SOPs, performance testing and commercial start-up
03
Edible Oil & Oleochemicals

600 MT/day Physical Refinery Commissioning

KLK Oleomas · Dumai, Indonesia

Lead commissioning, start-up, performance testing, troubleshooting and optimisation for a new physical refinery.

Project marker600 MT/day
  • Safe and systematic plant start-up
  • Coordination across engineering, maintenance and operations
  • Mechanical-integrity issue identified in the PFAD condenser
  • Corrective action enabled before commercial operation
  • Separate esterification optimisation increased output from 280 to 315 MT/day
  • Capacity improvement achieved without major capital investment
04
Glycerine Recovery

USP-Grade Glycerine Distillation Plant

U & P Pte Ltd · Singapore

Engineering and commissioning of dryer, main distillation and final purification systems for pharmaceutical-grade glycerine.

Project marker99.7% purity · SGD 521,290
  • Vacuum-system, condenser and utility refurbishment
  • Instrumentation and DCS recommissioning
  • Design yield and utility-consumption targets achieved
  • Stable vacuum distillation and consistent product quality
  • Mechanical decanter installed to reduce glycerine loss
  • Commercial handover for continuous production
05
Speciality Chemicals

TMPTO Synthetic Ester Plant

U & P Pte Ltd · Singapore

Complete Trimethylolpropane Trioleate process developed from laboratory studies through engineering, construction and commercial production.

Project markerSGD 702,257.42
  • Full process-technology development
  • EPC coordination with engineers, vendors and regulators
  • Design capacity and product quality achieved
  • Stable commercial start-up and handover
  • Catalyst changed from tin oxalate to PTSA
  • Reduced catalyst cost while maintaining product quality
06
Speciality Chemical Manufacturing

Four Commercial Toll-Manufacturing Processes

U & P Pte Ltd · Singapore

Process engineering, equipment selection, plant modification and commercial implementation for multinational customers, including ExxonMobil.

Project markerUSD 874,265 total
  • Four distinct speciality-chemical processes
  • Engineering through commissioning and commercial production
  • Required capacity and quality specifications achieved
  • Process reliability established
  • Regulatory approvals secured
  • Vendor, contractor and consultant coordination
07
Industrial Wastewater

100 m³/day Biological & Chemical Treatment Plant

U & P Pte Ltd · Singapore

Engineering, construction coordination, commissioning and optimisation of an integrated industrial wastewater treatment system.

Project markerSGD 180,000
  • Biological and chemical treatment
  • 100 m³/day design capacity
  • Plant commissioning and optimisation
  • Treated effluent achieved Singapore PUB discharge requirements
08
Waste Lubricant Recovery

Compliant Waste-Oil Recovery Process

Sin Hoe Seng Oil · Singapore

A low-capital process developed for used motor, hydraulic and lubricating oils, oily water and tank-cleaning slop oil.

Project markerSGD 35,020
  • Process flow, material balance and product specification
  • Documentation for Singapore NEA submission
  • Existing biodiesel equipment modified and reused
  • Committed capacity and quality verified
  • Enabled the NEA Toxic Industrial Waste Collector Licence
  • Commercial commissioning and handover
09
Waste-to-Value

Potassium Sulphate from Industrial By-Products

Evonik by-product stream · Singapore

A process developed to convert an AGRALI (MOLI) waste stream into commercially valuable potassium sulphate fertiliser.

Project markerSGD 266,093.60
  • Exothermic reaction-process development
  • Equipment selection and plant modification
  • Commissioning and process optimisation
  • Marketable K₂SO₄ fertiliser produced
  • Industrial waste-disposal requirement reduced
  • Circular-economy value created
10
Lubricant Processing

500 m³ Eductor Blending System

U & P Pte Ltd · Singapore

Design, installation and commissioning of a bulk blending system for base oil and additives.

Project marker500 m³ tank
  • Eductor mixing for a large storage tank
  • Mechanical agitator eliminated
  • Small-tank blending system designed
  • Cost-effective solution
  • Successfully commissioned and handed over for commercial production
YOUR PROJECT

Let's turn the next challenge into a commercial result.

Discuss your project